1. Preface
This operation manual aims to guide users to operate the vertical tube furnace correctly and safely, ensuring the smooth progress of experiments or production. Please read this manual carefully before use and comply with all safety regulations and operating procedures.
2. Equipment Overview
Vertical tube furnace is a device used for high-temperature heating, widely used in materials science, chemistry, metallurgy and other fields. It has the advantages of uniform heating, controllable temperature, and easy operation. This manual takes a certain model of vertical tube furnace as an example for explanation. Different models of equipment may have differences in details, please refer to the specific equipment manual.
3. Equipment composition
A vertical tube furnace is mainly composed of a furnace body, heating elements, temperature control system, furnace tubes, gas path system, and other parts. The furnace body is the main part of the equipment, and the heating element is located inside the furnace body, heating the furnace tube through electric current. The temperature control system is used to control the temperature inside the furnace, ensuring the stability and accuracy of the temperature. A furnace tube is a container for placing samples, usually made of high-temperature resistant materials. The gas path system is used to introduce protective gas or reactive gas into the furnace tube.
4. Preparation before operation
Safety inspection: Check if all components of the equipment are intact, if the power cord is properly connected, and if the pneumatic system is unobstructed.
Cleaning the furnace: Clean the interior of the furnace before use to ensure that there are no impurities or residues.
Installation of furnace tube: Install the furnace tube into the furnace body according to the instructions, ensuring good sealing.
Set temperature control program: Set the temperature control program according to experimental or production requirements, including parameters such as heating rate, target temperature, and holding time.
5. Operation steps
Connect power: Insert the device power plug into the socket and turn on the power switch.
Start the temperature control system: Press the temperature control system start button to enter the temperature control program settings interface.
Enter temperature control program: Enter the temperature control program curve according to experimental or production requirements to ensure correct input.
Place the sample: Place the sample to be heated in the designated position inside the furnace tube and close the furnace tube cover.
Introduce protective gas: If protective gas is needed, open the valve of the gas system and introduce an appropriate amount of protective gas.
Start heating: Press the heating start button, and the device will start heating according to the set temperature control program.
Observation record: Pay attention to the temperature changes in the furnace and the reaction of the sample during the heating process, and keep records.
End heating: After the heating program is completed, the device will automatically stop heating or manually stop heating. At this time, it is necessary to wait for the temperature inside the furnace to drop to a safe range before taking out the sample.
6. Precautions
Safe operation: During the operation process, it is necessary to strictly comply with safety regulations and operating procedures to ensure personal and equipment safety.
Temperature calibration: The equipment should be temperature calibrated before formal use to ensure the accuracy and stability of temperature control.
Protective gas: If protective gas needs to be introduced, please ensure that the gas purity and flow rate meet the requirements, and regularly check whether the gas path system is unobstructed.
Sample processing: During the heating process, attention should be paid to the changes in the sample to avoid dangerous situations such as explosions and splashes. After heating, samples and waste should be properly disposed of.
Equipment maintenance: Regularly maintain the equipment, including cleaning the furnace, replacing heating elements and other components, to ensure the normal operation of the equipment and extend its service life.
7. Troubleshooting
If you encounter equipment malfunctions or abnormal situations during use, please turn off the power of the equipment in a timely manner and contact professional maintenance personnel for handling. Do not disassemble or repair equipment without authorization to avoid causing greater losses and danger.
8. Summary
Vertical tube furnace is an important high-temperature heating equipment with wide applications in materials science, chemistry, metallurgy and other fields. Through the guidance of this operation manual, users can operate the vertical tube furnace correctly and safely, ensuring the smooth progress of experiments or production. Please strictly follow safety regulations and operating procedures during use, and regularly maintain the equipment to ensure its normal operation and extend its service life.

Contact Information

E-mail:
web@kejiafurnace.com
Address:
No.18 Hongye Road, Hi-tech zone , Zhengzhou, China, 450000
QQ tel Email WhatApp FaceBook

Tel Number

181-3719-5600

Email

web@kejiafurnace.com

WhatsApp

+86/18037178440

FaceBook

Zhengzhou/Kejia

kejialiuyan