Website navigation

TECHNICAL

Position:Home > Technical

Laboratory rotary furnace operation process

Time:2024-09-03 Click:0
  

The operation process of the laboratory rotary furnace is a rigorous and meticulous process, involving multiple steps to ensure the safety of the experiment and the accuracy of the results. The following is a typical laboratory rotary furnace operation process:
1. Preparation work
Equipment inspection: Check whether the rotary furnace and its related supporting facilities are safe and intact, ensuring that the equipment is in normal operation. This includes checking key components such as power supply, transmission system, furnace body, temperature control system, etc.
Cleaning the furnace: Clean the residue and impurities inside the furnace to ensure that it is clean and free of debris. This helps to avoid contamination and errors during the experimental process.
Preparation of materials: According to the experimental requirements, prepare the materials that need to be processed and arrange them in the prescribed proportion and order.
2. Startup and preheating
Connect the power supply: After ensuring the stability and reliability of the power supply, turn on the power switch of the rotary furnace.
Set parameters: According to the experimental requirements, set the temperature, speed, time and other parameters of the rotary furnace. This is usually done through buttons or knobs on the temperature control system and transmission system control panel.
Preheating furnace body: Start the rotary furnace to preheat the furnace body. The preheating time depends on the furnace material and experimental requirements, and usually requires a period of time to reach a stable working temperature.
3. Feeding and operation
Feeding: After preheating the furnace, add the material into the furnace according to the experimental requirements. During the feeding process, attention should be paid to the uniformity and stability of the materials to avoid accumulation or displacement in the furnace.
Start rotation: Start the transmission system of the rotary furnace to make the furnace body start rotating. The rotation speed should be adjusted according to experimental requirements and material characteristics to ensure uniform processing of materials in the furnace.
Monitoring operation: During the operation of the rotary furnace, close attention should be paid to the changes in parameters such as temperature and speed inside the furnace, and records should be kept at all times. At the same time, pay attention to the processing effect of materials in the furnace, and promptly handle any abnormalities.
4. Experiment completion and cleaning
Turn off the equipment: When the experiment reaches the predetermined time or completes the predetermined goal, first turn off the transmission system to stop the furnace body from rotating, then turn off the temperature control system and power switch, and cut off the power.
Material retrieval: After the furnace body has cooled to a safe temperature, open the furnace door and retrieve the processed material. Be careful not to burn or damage the equipment when removing materials.
Cleaning the furnace: Clean the residue and impurities inside the furnace again to prepare for the next experiment.
5. Precautions
Safe operation: Strictly follow the safety operation procedures and laboratory rules and regulations throughout the entire operation process to ensure personal safety and equipment safety.
Precise control: In setting parameters and monitoring the operation process, it is necessary to accurately control the changes in various parameters to ensure the accuracy and reliability of experimental results.
Timely recording: During the operation process, various data and observation results should be recorded in a timely manner for subsequent analysis and summary of experimental experience.
In summary, the operation process of the laboratory rotary furnace is a complex process that includes multiple steps such as preparation work, start-up and preheating, feeding and operation, experiment completion and cleaning. Only by strictly following the operating procedures can the safety of the experiment and the accuracy of the results be ensured.

Contact Information

E-mail:
web@kejiafurnace.com
Address:
No.18 Hongye Road, Hi-tech zone , Zhengzhou, China, 450000
QQ tel Email WhatApp FaceBook

Tel Number

181-3719-5600

Email

web@kejiafurnace.com

WhatsApp

+86/18037178440

FaceBook

Zhengzhou/Kejia

kejialiuyan